ocation: Paso de los Toros, Uruguay
YEAR: 2021 - 2022
Construction of a 7,760 m2 industrial building that required 145 tons of metal structure. It has 2 levels for workshop, storage and offices. It includes finishes and an open shed for machinery storage. The assembly of all the machinery installed in the workshop was also carried out.